Update on Knitting Projects

It’s been several days since my last post. I have been busy with Christmas preparations. Finally have all the Christmas decorating done and can now concentrate on finishing up my Christmas knitting projects. I have finished the Chevron Scarf — but since I had enough yarn leftover, I decided to knit a tam to go with the scarf. Here’s a picture:

ChevronTam1

I’m almost done, however, I’m not totally certain this item is going to turn into an actual tam. I’m following the basic instructions from EZ in Knitting without Tears, adjusting for gauge,etc. But still, when I put it on my head, it doesn’t look like a tam. I’m going to trust EZ and see what it looks like when washed and dried over a large dinner plate. 🙂

That leaves the Diamond Brocade patterned scarf for my DD to finish. I haven’t knit on this at all since before Thanksgiving, so as soon as I finish the tam, I will focus on getting this done.

DS has just requested new socks for Christmas. (Sigh…) He’s going to get two balls of yarn and a promise for a hand-knitted pair from me to come after Christmas.

I have placed the SFS socks in time out. The gusset on the darn things appears to have holes where I picked up stitches even though I knit through the back loops to make the stitches tighter. I think this is probably due to the extra stretchiness of the Regia stretch yarn. I’m going to have to frog back to the heel turn and start the gusset over. 🙁 I just can’t cope with this at the moment — hence the time out. Looks like January knitting will be baby items and socks!

1 thought on “Update on Knitting Projects”

  1. Seems you are making progress on things, even if it is slow. I posted the link to how I did my Ravelry bars on my blog yesterday.

Comments are closed.

Related Post

SFS Care Package on Its WaySFS Care Package on Its Way

My first pair of regulation Olive Drab (OD) socks have been washed and a darning kit has been carefully made and pinned to the toes. The SFS sock band has been completed along with a written note for the recipient of the socks. All this went into a gallon size plastic bag. I also finished my first SFS beanie — It went with the socks into the bag.
SFS_Beanie1

Along with the socks, I have sent a mixed assortment of “goodies” for the soldier. I gathered snacks and a number of items like sunscreen, Q-tips, Wet Ones wipes, & Chapstick to include with my socks. It made for a nice little care package.
SFS_CarePkg1

Package has been mailed off to Sarge — who will now send it along with numerous other such packages to a group of soldiers serving somewhere overseas.

WIPs – Goals For OctoberWIPs – Goals For October

I still have far too many works in progress! I have made some headway on them, but I keep wanting to start more and find myself having to exercise some mental discipline. For now, I will not start any more projects until I finish the following:

Aida Scarf
Lace Scarf for DIL (nearly 50% completed)

SFS_12inches
Regulation Socks – SFS (ready to start the heel)

I am also prioritizing the projects that I have planned and for which I have purchased yarn. I hope this will keep me from my insane tendency to have too many projects on needles. In order of priority, the planned projects are: 1) Textured Scarf for DD; 2) Striped Scarf for JC; 3) Baby Sweater and Romper for new grandchild; 4) Regulation hat for SFS. The first two are Christmas presents, so I hope to start them sometime this month.

I have also decided that there are some WIPs that can just sit patiently on their needles and wait for a time when I am ready to pick them up and finish them. These are projects without any identified recipients or times for completion: So the Cable Rib Socks (for me), the two shawls and a “Moderne Baby Blanket” currently on needles are on hold for now.

Now, I just have to avoid the temptation of yarn shops and yarn sections in craft stores…

FO: SFS Team Knit SocksFO: SFS Team Knit Socks


I have finally finished my second pair of SFS (Socks for Soldiers) OD regulation socks. This pair was team knit with another SFS knitter who knit the legs on her circular sock machine. I am amazed at how long these socks are when they are finished.


While I was finishing up these socks, the President of SFS emailed a request out to members for cotton washcloths. So, since I needed a break from knitting on very small needles, I knit up three cotton washcloths to go along with the socks.


In addition to the socks and washcloths, I purchased a few toiletries and some non-perishable goodies to send as part of my package to SFS. All of this will get pooled with supplies from other knitters and placed into a larger shipment that will make its way to one of the military units on our list. It feels good to know that a soldier serving somewhere outside of the U.S. will be getting special treats from home.