FO: Diamond Brocade ScarfFO: Diamond Brocade Scarf

Diamond Brocade Scarf

Diamond Brocade Scarf

I didn’t quite get the Diamond Brocade Scarf finished by Christmas as I had hoped. But since my DD was home for Christmas, I was able to consult her about the length and make certain it was the length she wanted. I actually finished the project during the first leg of our cross-country trip after Christmas.

The scarf was knit up in Cascade Yarns Cash Vero DK yarn, which is a blend of merino wool, microfiber & cashmere. It is very soft and has a wonderful drape. As you can see, DD loved the finished item.

Details on this project can be found on my projects page at Ravelry, if you’d like more information.

10 in 201010 in 2010

I’ve signed on for a Ravelry group called “10 in 2010”. The idea is to identify 10 knitting projects you want to complete in 2010 and share your progress with the group. It’s a variation of a knit along.

So here is my “10 in 2010” project list:

  1. Baby Romper & Cardigan(from Dale of Norway – Baby 203) in Baby Ull
  2. EZ Green Sweater – because I want to learn to steek – yarn to be determined
  3. Manly Aran Socks (from Knitting More Circles around Socks) in Knit Picks Stoll – merlot colorway
  4. Finish Cable Rib Socks in Knit Picks Risata – baby doll colorway
  5. Socks for me using Zueberball yarn – pattern to be determined
  6. SFS Socks in Regia stretch – olive drab color
  7. Teddy Bear (from Debbie Bliss Toy Knits) – using Peaches & Cream yarn
  8. Socks using Brown Sheep Wildfoote yarn
  9. Socks using Debbie Norville Serenity Yarn
  10. Hat & matching scarf for me — yarn and pattern to be determined

This is an easy way to set some goals for knitting projects. If you are on Ravelry and are interested in joining, go to Groups and look for “10 in 2010”. Happy Knitting.

Happy New Year! Ending 2009 and Beginning 2010Happy New Year! Ending 2009 and Beginning 2010

Happy New Year, Everyone! It’s been quite a year, hasn’t it? Many changes, many happenings. As always, some good, some okay, and some not so good. I am fortunate that most things that happened for me in 2009 were good. And I look forward to new beginnings in 2010.

2009 ended with the Christmas Blizzard of 2009 – where we received somewhere between 12 and 14 inches of snow along with high winds and drifting. This caused a number of changes to our traditional Christmas plans and meant going to plan B & C when it came to celebrating with family members. I’m sure it will be a Christmas we all remember – because, in spite of the weather, we managed to celebrate and share the holiday with family.

On December 28, my daughter and I embarked upon a cross-country road trip from Omaha to Boston. (That’s approximately 1500 miles, give or take a few.) We did this so she could take her new car back to Boston. We started out at 6:30 AM – and after being momentarily stuck in the snow just past our driveway, had clear roads all the way into Ohio – where we spent the night. We pushed to make it a distance of 846 miles (14 hours of driving with just a few short stops). I thought I’d get a lot of knitting done on this trip, but it didn’t happen.

The next morning, we hit the road at 6:30 AM. It was snowing lightly when we left, but we soon drove out of it and headed for Pennsylvania. Daughter was driving and about 30 minutes into Pennsylvania we came around curve and drove straight into white-out, blizzard conditions, with traffic moving cautiously at less than 40 mph. Luckily, conditions improved rapidly and by the time we reached the next exit, road was improved enough for us to continue our journey. After a coffee-break/potty break in Clearfield, PA, I took over driving and drove all the way to Danbury, CT, where we stopped to eat and change drivers. We made into Boston around 6:00 PM.

That’s an exhausting 2-day drive, to say the least. But we had each other’s company, saw some beautiful country and arrived safely at our destination. Plus, I had another day to enjoy with my daughter in Boston.

I flew home yesterday, dealing with a delay out of Boston that left me only 10 minutes to catch my connecting flight to Omaha. Fortunately, the airline held the flight so that all of us on the flight going to Omaha could make it. (Thank-you, Midwest Airlines). After arriving back in Omaha, DH and I went to see “Sherlock Holmes” at the local movie theater, then went home and I fixed a late supper, then crashed around 10:00 PM. We ended 2009 by sleeping through all the hoopla… 🙂

So we are now at the beginning of 2010. Today, I plan to finalize my 10 in 2010 list (Ravelry Group), relax and just enjoy a quiet day at home. Now where did I leave my knitting? ….

Three Days before ChristmasThree Days before Christmas

As the title of this post states, it’s just three days before Christmas and I am down to the wire with two Christmas presents still on needles. I just haven’t had enough time this last week to knit very much. But I DO have all my Christmas shopping done. (This includes all the supplies for Christmas dinner.)

There’s a Winter Storm Watch in place for Omaha and most of the surrounding states and if the weathermen are correct, we will be snowed in for Christmas. The snow is supposed to start on Christmas eve after 2 days of freezing rain, which is supposed to start tonight.

Fortunately, our only traveling member of the family — my DD from Boston, has already arrived ahead of the storm. Now all we need to do is batten down the hatches and ride out the blizzard — I sense some long uninterrupted knitting time in my near future….

Hopefully, I will have a chance to take some pictures and post them before I need to wrap up the unfinished knitted projects. Happy Holidays!