Category: WIPs

Update on Progress with SFS Team-Knit SocksUpdate on Progress with SFS Team-Knit Socks

SFS_TK_Heels1I knitted the heel and had about half of the gussets done on these socks when I decided that I did NOT like the way the picked up stitches for the gussets looked. They weren’t tight enough and appeared to have small holes along the picked up edge. Frustrating, VERY frustrating – especially since these socks must be knit to very high standards. I don’t know if the problem is the way I picked up the stitches – or if I pulled the yarn too tight. I have found that the Regia Stretch yarn used for these socks can be overstretched – it is a very stretchy yarn.

I put the socks in “time out” over the Christmas holidays – just too stressful to deal with them given all the other demands of the season. Last week, I pulled them out, put in lifelines at the instep and the end of the heel turn and then frogged them back to the point where I need to pick up the gusset stitches. 🙁

I plan to tackle the picking up of the gusset stitches this week, paying special attention to how the stitches form as they are picked up…and trying to avoid overstretching the yarn…I will let you know how it goes.

WIP: Socks for DSWIP: Socks for DS

My DS put “socks that won’t wear out at the heels” on his Christmas list. It was a late request – and not one that would I would likely be able to meet by Christmas – but it was an invitation to knit socks for someone I love!

MattsSocks_Foot2So – I started a pair of socks – plain label version, cuff-down with 2 X 2 ribbing for the heel and instep. I used Knit Picks Stoll in Carbon Twist colorway. I got about 6 inches of the cuff done before Christmas and so I wrapped the “in progress” socks up along with two additional balls of yarn (Knit Picks Stoll – Merlot colorway) for another pair of socks and gave it to him as a Christmas present, with the promise that they would actually become socks.

The Carbon Twist socks are now about 75% complete – I am working on the foot and heading for the toe. I love the way this yarn knits up – it’s great for a pair of men’s socks. I knit the cuff for 6 inches on size US 1 needles (2.50 mm) and then went down to size US 0 (2.00 mm) for another 2 inches on the cuff , the heel flap and approximately half of the gusset before switching back to the larger needle. This produces a denser knit heel and should increase the wearbility of the socks. I intend to knit the toes on the smaller needles for the same reason.

For the Merlot colorway yarn, I am planning on doing the “Manly Aran” socks pattern from Antje Gillingham’s Knitting More Circles around Socks. This is a toe-up pattern and I am looking forward to trying this out using Magic Loop.

10 in 201010 in 2010

I’ve signed on for a Ravelry group called “10 in 2010”. The idea is to identify 10 knitting projects you want to complete in 2010 and share your progress with the group. It’s a variation of a knit along.

So here is my “10 in 2010” project list:

  1. Baby Romper & Cardigan(from Dale of Norway – Baby 203) in Baby Ull
  2. EZ Green Sweater – because I want to learn to steek – yarn to be determined
  3. Manly Aran Socks (from Knitting More Circles around Socks) in Knit Picks Stoll – merlot colorway
  4. Finish Cable Rib Socks in Knit Picks Risata – baby doll colorway
  5. Socks for me using Zueberball yarn – pattern to be determined
  6. SFS Socks in Regia stretch – olive drab color
  7. Teddy Bear (from Debbie Bliss Toy Knits) – using Peaches & Cream yarn
  8. Socks using Brown Sheep Wildfoote yarn
  9. Socks using Debbie Norville Serenity Yarn
  10. Hat & matching scarf for me — yarn and pattern to be determined

This is an easy way to set some goals for knitting projects. If you are on Ravelry and are interested in joining, go to Groups and look for “10 in 2010”. Happy Knitting.

Three Days before ChristmasThree Days before Christmas

As the title of this post states, it’s just three days before Christmas and I am down to the wire with two Christmas presents still on needles. I just haven’t had enough time this last week to knit very much. But I DO have all my Christmas shopping done. (This includes all the supplies for Christmas dinner.)

There’s a Winter Storm Watch in place for Omaha and most of the surrounding states and if the weathermen are correct, we will be snowed in for Christmas. The snow is supposed to start on Christmas eve after 2 days of freezing rain, which is supposed to start tonight.

Fortunately, our only traveling member of the family — my DD from Boston, has already arrived ahead of the storm. Now all we need to do is batten down the hatches and ride out the blizzard — I sense some long uninterrupted knitting time in my near future….

Hopefully, I will have a chance to take some pictures and post them before I need to wrap up the unfinished knitted projects. Happy Holidays!