Lindy's Knits & Laces knitting,Knitting Projects,Lace Knitting,Scarves,WIPs WIP: Clapotis Scarf in Jaggerspun Zephyr

WIP: Clapotis Scarf in Jaggerspun Zephyr

I have started another project even though I have at least two others on needles. I just got the itch to knit the Clapotis Scarf pattern along with some of the other members of my knitting guild. It took me a bit of time to decide to join the knit-along, because I wanted to use yarn from my stash rather than buy yarn for this project. I finally settled on the Jaggerspun Zephyr lace weight yarn I had left over from a lace scarf I knit for my DD a couple of years ago. This yarn is 50% fine grade merino wool and 50% Chinese Tussah silk in 2/18 Lace Weight. The colorway is Teal. I am using size US 4 (3.5 mm) needles.

This scarf is knit by starting at one point of a parallelogram and increasing stitches until you reach the desired width of the scarf. Then you knit a series of straight row sections until you have your desired length and then you decrease stitches until you reach the far corner of the scarf. Along the way, you drop stitches to create an open pattern between rows of stockinette stitches.
So far, I have knitted the increase section to the point where I will begin the straight rows and start dropping stitches. Here’s a picture:

The Clapotis pattern is free on Knitty.com. Here’s a link to the pattern: Clapotis Pattern

1 thought on “WIP: Clapotis Scarf in Jaggerspun Zephyr”

Comments are closed.

Related Post

Works in ProgressWorks in Progress

I have decided that I have too many projects in progress and absolutely cannot start anything else until I get at least three of them done: Not only do I have 5 knitting projects and 1 crochet project “in the works”, but have 3 more planned, plus a sewing project that must be completed in the next two weeks. I have always had the tendency to have several things going at once – but really, this is ridiculous!

Here are the knitting projects I must complete BEFORE starting anything else:

Knitted Bunny – ready for assembly.

Knitted Bunny

Knitted Bunny

Lace Scarf – this is a Christmas gift:

Lace Scarf WIP

Lace Scarf WIP

Cable Ribbon Socks – Guild Meet Up project.

Cable Rib Socks - knitting magic loop method

Cable Rib Socks - knitting magic loop method

Vintage Crochet Edging – just need to finish the write up on the pattern:

Vintage Crochet Edging -- WIP

Vintage Crochet Edging -- WIP

I plan to do the sewing project over the Labor Day Weekend and will post pictures when finished.

Update on Knitting ProjectsUpdate on Knitting Projects

It’s been several days since my last post. I have been busy with Christmas preparations. Finally have all the Christmas decorating done and can now concentrate on finishing up my Christmas knitting projects. I have finished the Chevron Scarf — but since I had enough yarn leftover, I decided to knit a tam to go with the scarf. Here’s a picture:

ChevronTam1

I’m almost done, however, I’m not totally certain this item is going to turn into an actual tam. I’m following the basic instructions from EZ in Knitting without Tears, adjusting for gauge,etc. But still, when I put it on my head, it doesn’t look like a tam. I’m going to trust EZ and see what it looks like when washed and dried over a large dinner plate. 🙂

That leaves the Diamond Brocade patterned scarf for my DD to finish. I haven’t knit on this at all since before Thanksgiving, so as soon as I finish the tam, I will focus on getting this done.

DS has just requested new socks for Christmas. (Sigh…) He’s going to get two balls of yarn and a promise for a hand-knitted pair from me to come after Christmas.

I have placed the SFS socks in time out. The gusset on the darn things appears to have holes where I picked up stitches even though I knit through the back loops to make the stitches tighter. I think this is probably due to the extra stretchiness of the Regia stretch yarn. I’m going to have to frog back to the heel turn and start the gusset over. 🙁 I just can’t cope with this at the moment — hence the time out. Looks like January knitting will be baby items and socks!

Update on Progress with SFS Team-Knit SocksUpdate on Progress with SFS Team-Knit Socks

SFS_TK_Heels1I knitted the heel and had about half of the gussets done on these socks when I decided that I did NOT like the way the picked up stitches for the gussets looked. They weren’t tight enough and appeared to have small holes along the picked up edge. Frustrating, VERY frustrating – especially since these socks must be knit to very high standards. I don’t know if the problem is the way I picked up the stitches – or if I pulled the yarn too tight. I have found that the Regia Stretch yarn used for these socks can be overstretched – it is a very stretchy yarn.

I put the socks in “time out” over the Christmas holidays – just too stressful to deal with them given all the other demands of the season. Last week, I pulled them out, put in lifelines at the instep and the end of the heel turn and then frogged them back to the point where I need to pick up the gusset stitches. 🙁

I plan to tackle the picking up of the gusset stitches this week, paying special attention to how the stitches form as they are picked up…and trying to avoid overstretching the yarn…I will let you know how it goes.